Lightweight split ceramic fiber tube furnace chamber section

01Case library

Lightweight three-zone split tube furnace chamber project

A lightweight three-zone split ceramic fiber chamber with OD250 mm, ID120 mm and a 1524 mm total assembled length made from three 508 mm heated sections.

OD250 / ID120 mmreference diameters
1524 mmtotal assembled length
3 × 508 mmheated sections

02Overview

The views show the individual 508 mm sections and matched halves that form the 1524 mm assembled configuration, including the split cylindrical body, longitudinal spiral elements, leads and bore construction.

03Product requirements

Three-zone split tube chamber: dimensions and included components.

The recorded assembly is OD250 mm and ID120 mm, with a total length of 1524 mm divided into three 508 mm heated sections. Matched split halves give access around the process tube; the process tube itself is outside this supply example.

Product family
Three-zone split tube chamber
Application
Tube furnace OEM equipment
Included components
Three matched 508 mm split sections
Order quantity
Prototype, sample or production batch
01

Geometry and mating faces

Identify the lightweight three-zone split tube furnace chamber project on the drawing and dimension its working opening, outside body and critical contact faces.

02

Installation and component boundaries

Mark the supplied pieces and their installed orientation. Include the surrounding equipment, support and access requirements that affect fit.

03

Operating and electrical inputs

State the operating cycle, atmosphere and quantity. For heated components, identify voltage, power, circuits, sensors and lead directions.

04

Electrical interfaces

Voltage, power, circuits, lead exits and terminal positions are coordinated with the equipment frame.

04Three-zone split tube chamber construction

Construction and manufacturing details.

01

Keep section and assembly lengths distinct

The documented length is 3 × 508 mm = 1524 mm. Mark individual section lengths and their positions on the furnace layout.

02

Match halves around the ID120 bore

The two halves of each section must be identified as a pair. For a replacement, confirm tube clearance and the joint relationship from the installation drawing.

03

Map circuits to the three sections

The photographs show longitudinal spiral elements and leads. List the zone-to-circuit relationship and terminal direction with the section arrangement.

06Configuration highlights

Product configuration and key dimensions.

  • Lightweight split cylindrical ceramic fiber construction
  • OD250 mm and ID120 mm recorded dimensions
  • 1524 mm total assembled length
  • Three 508 mm heated sections
  • Longitudinal spiral elements, leads and machined bore visible in the project photographs

07Production & quality checks

Checks applied before packing.

  • Bore diameter and split plane visible with the chamber open
  • Longitudinal spiral layout visible in the element detail
  • Matched halves shown together in their assembly orientation
  • Three 508 mm sections used for the 1524 mm assembled length

08Request a similar product

Specify the dimensions and quantity for your order.

Include Process-tube outside diameter and required clearance; Overall and heated lengths; Full-circle or split access requirement, together with the required quantity and any available drawing or measured sample.

10Case FAQ

Ordering and customization questions.

01Is 508 mm the length of the complete assembly?+

No. Each of the three heated sections is 508 mm; the documented assembled length is 1524 mm.

02Does ID120 mean a process tube of exactly 120 mm will fit?+

ID120 is the recorded chamber bore. Confirm the actual process-tube outside diameter, required running clearance and supports before specifying a replacement.

12Similar product quotation

Request a similar three-zone split tube chamber.

Email the example name, the dimensions or features you need changed, operating temperature and quantity. A drawing or photograph is welcome.